CCR Rule Compliance Data and Information

Skippers Storage Facility · Virginia DEQ Solid Waste Permit No. 632 · ERI Development, LLC, owner and operator

This page is maintained under 40 CFR 257.107, the federal rule governing the disposal of coal combustion residuals (CCR). It holds the documents the rule requires the facility to make public for the CCR landfill unit at 234 Forest Road, Skippers, Greensville County, Virginia. Documents are posted within 30 days of being placed in the facility operating record and remain available for at least five years.

No registration or request is needed. Each file can be viewed, printed and downloaded. Questions about the facility or this page: ccr@eri-waste.com or write to ERI Development, LLC, 8007 Aberdeen Road, Bethesda, Maryland 20814.

About the facility

The Skippers Storage Facility receives coal combustion residuals by rail from Dominion Energy's Chesterfield Power Station and places them in a lined storage unit of three cells covering 27.9 acres. Stored CCR is later excavated and processed on site into a cementitious material for concrete, so the unit is intended to be emptied through beneficial use rather than closed in place. The facility is regulated by the Virginia Department of Environmental Quality, Piedmont Regional Office, and by the federal CCR rule, 40 CFR Part 257, Subpart D. The CCR unit is a new CCR landfill under that rule.

Location restrictions 40 CFR 257.60–257.64; 257.107(e)

Demonstrations, certified by a qualified professional engineer, that the CCR unit meets each location restriction. Required before the unit first receives CCR and for each cell before construction. Retained until closure of the unit is complete.

DocumentRule citationPlaced in operating recordPostedFile
Placement above the uppermost aquifer demonstration257.60(a); 257.105(e)(1)——Not yet required
Wetlands demonstration257.61(a); 257.105(e)(2)——Not yet required
Fault areas demonstration257.62(a); 257.105(e)(3)——Not yet required
Seismic impact zones demonstration257.63(a); 257.105(e)(4)——Not yet required
Unstable areas demonstration257.64(a); 257.105(e)(5)——Not yet required

Design criteria 40 CFR 257.70–257.71; 257.107(f)

Certifications that the liner and leachate collection system were designed and constructed to the rule's requirements. The design certification is posted within 60 days of the start of construction; the construction certification before the unit first receives CCR.

DocumentRule citationPlaced in operating recordPostedFile
Design certification, alternative composite liner and leachate collection system257.70(e); 257.105(f)(1)——Not yet required
Construction certification, composite liner and leachate collection system257.70(f); 257.105(f)(1)——Not yet required
Documentation of liner type257.71(b); 257.105(f)(1)——Not yet required
Design and construction plans and permit application257.105(f)(21)——Not yet required

Operating criteria 40 CFR 257.80–257.84; 257.107(g)

Plans for controlling fugitive dust and stormwater, and the inspection reports that show they are being followed. The dust report and the engineer's inspection report are posted annually.

DocumentRule citationPlaced in operating recordPostedFile
CCR Fugitive Dust Control Plan257.80(b); 257.105(g)(1)——Not yet required
Annual CCR Fugitive Dust Control Report257.80(c); 257.105(g)(2)——Not yet required
Run-on and Run-off Control System Plan257.81(c); 257.105(g)(3)——Not yet required
Weekly inspection records summary257.84(a); 257.105(g)(8)——Not yet required
Annual inspection report by a qualified professional engineer257.84(b); 257.105(g)(9)——Not yet required

Groundwater monitoring and corrective action 40 CFR 257.90–257.98; 257.107(h)

Certifications for the groundwater monitoring system and statistical methods, the annual groundwater report (due by January 31 each year), and any notices of statistically significant results and the response to them.

DocumentRule citationPlaced in operating recordPostedFile
Groundwater monitoring system certification257.91(f); 257.105(h)(1)——Not yet required
Statistical method certification257.93(f)(6); 257.105(h)(2)——Not yet required
Annual Groundwater Monitoring and Corrective Action Report257.90(e); 257.105(h)(1)——Not yet required
Notifications of statistically significant increases or levels, if any257.94(e), 257.95(g); 257.105(h)(3), (h)(6)——Not yet required
Alternate source demonstrations, if any257.94(e)(2), 257.95(g)(3); 257.105(h)(3), (h)(7)——Not yet required

Closure and post-closure care 40 CFR 257.100–257.104; 257.107(i)

The current closure and post-closure plans, and notices and progress reports as closure proceeds. The approved closure method for this unit is removal of CCR.

DocumentRule citationPlaced in operating recordPostedFile
Written Closure Plan257.102(b); 257.105(i)(4)——Not yet required
Written Post-Closure Plan257.104(d); 257.105(i)(12)——Not yet required
Notification of intent to close257.102(g); 257.105(i)(5)——Not yet required
Annual closure progress report257.102(h); 257.105(i)(6)——Not yet required
Notification of completion of closure257.102(h); 257.105(i)(7)——Not yet required

Posting history

Every change to this page is logged here, newest first.

DateChange
2026-11-09Page established. No documents yet required to be posted; the facility has not begun construction or received CCR.

Document files are stored at /skippers-ccr/documents/ and named YYYY-MM-DD_section_short-title.pdf. If the address of this page changes, EPA and Virginia DEQ are notified within 14 days as the rule requires.